Services

Since its founding, SC VICTEMA CONS SRL has made constant efforts to expand our equipment repertoire and improve our personnel through training courses and specialization in construction.

Logistic specifications:

  • three TURCHI P260/S equipment(2012-2013)
  • two 20 tones trucks (with crane),
  • four 3,5 tones trucks
  • one 5 tones fork lift truck

Personnel and team assignment

  • 3 teams for crash barrier installation and maintenance – 21 people plus 2 truck drivers, one forklift driver and one team coordinator
  • 1 team for bridge crash barrier installation and maintenance, metal structures, sound proofing panels – 5 people plus one engineer

Workrate by team and product type

  • semi-heavy parapet N2 : 1000 ÷ 1500 ml/ day
  • heavy parapet H1: 800 ÷ 1200 ml/day
  • heavy parapet H2: 700 ÷ 1100 ml/day
  • very heavy parapet H3: 200 ÷ 400 ml/day
  • very heavy parapet H4: 100 ÷ 300 ml/day

The high quality standards practiced by our company, coupled with our dedication to ensuring customer satisfaction, within the provided deadlines and budgetary constraints have ensured that we have managed to successfully undertake both national (Romanian) and international projects such as:

  • The “Sebes-Sibiu” highway segment 4 – directional curb crash barrier and bridge barrier
  • The “ Timisoara – Lugoj” highway segment 1 – directional crash barrier and pedestrian barrier
  • The “Cernavoda – Megidia” A2 highway – directional crash barrier rehabilitation and maintenance
  • The “Oradea” bypass sector 2 – directional crash barrier
  • The “Alexandria” bypass – directional crash barrier
  • The “Alexandria-Maldaieni” DN 6 roadway segment 1– directional crash barrier
  • The “Zalau – Rastoci” DN 1h roadway – directional crash barrier
  • The “Tutova – Albita” Dn 24 si Dn 24B roadway  – directional crash barrier and pedestrian barrier
  • The “Huruiesti – Parincea” Dj 252 roadway segment 1 , segment 2 “Parincea – Buhoci” – directional crash barrier and pedestrian barrier